Meta, a client of ENG, is developing a new Data Center, and I participated in the design of the MEP systems. My work focused on modeling and development of drawings for piping systems, including domestic cold water, domestic hot water, drain, and vent.

 

Redesign, stress analysis, drawing production and coordination with the various systems within the building were performed. In addition, each task underwent a rigorous quality control process prior to final delivery, ensuring that it met the standards required by the construction company, USE (United States Engineering).