Consulting firm dedicated to MEP (Mechanical, Electrical & Plumbing) installation projects - specifically HVAC and plumbing - in charge of the installations of a new shopping mall, called Parque La Molina, in early 2024.

 

In this project I worked as assistant mechanical engineer to the resident engineer. In addition, there was a safety engineer in the team and two industrial engineers. We were in charge of three teams of technicians assigned to installation of ducts and mechanical equipment, installation of drainage pipes and installation of domestic water pipes.

 

The following images show an overview of the BIM design of the shopping center, two installation drawings and a photo of the work in progress.